1. 350vip浦京集团




      1. CORREN POSITION: HOME1 > NEWS CENTER > News

        Unit-1 of Philippines Puting Bato 1x135MW Coal-Fired Power Plant Project Succeeded in Generating at Full Load

        Source: Author : Date :2014-10-16【Font:B M S


        At 10:30 on Oct.16, Unit-1 of Philippines Puting Bato 1x135MW Coal-Fired Power Plant Project contracted by CNTIC generated at the full load achieving 135MW at the first time. The three main equipments runs well with good parameters.




        1. XML地图